Skip to content
Delivery At Site • Commercial Wholesale Terms

Terms & Conditions

Welcome to Delivery At Site. These commercial terms govern the purchase, wholesale quotation, direct site delivery, and procurement of construction materials, architectural hardware, and interior supplies through our platform. By placing an order or requesting a quote, your firm agrees to these transparent terms.

100% Tax Compliant

Every commercial dispatch is accompanied by an original GST tax invoice and valid e-Way bill for seamless input tax credit (ITC).

Direct Site Offloading

Deliveries are dispatched straight to your registered project site address with advance transit alerts for seamless truck unloading.

Certified Material Grades

All materials comply with national Bureau of Indian Standards (BIS/IS) certifications and genuine brand manufacturer warranties.

01

Commercial Buyer Eligibility & Accounts

Guidelines for contractors, project engineers, architects, and institutional purchasing agents.

1.1

Authorized Commercial Buyers

Our platform caters primarily to construction firms, builders, architects, interior professionals, and independent contractors legally registered in India.

1.2

Accurate GSTIN Verification

To avail B2B input tax credit, buyers must furnish a valid GSTIN and registered trade name before invoice generation. Invoices cannot be amended once e-Way bills are filed.

1.3

Account Security

Buyers are responsible for maintaining the confidentiality of their account login credentials and keeping authorized site contact details updated.

1.4

Authorized Purchase Representatives

Any project manager, site engineer, or procurement officer placing an order on behalf of a registered company is deemed authorized by that company.

02

Wholesale Pricing, Quotations & GST Invoices

Clear rules governing bulk project estimates, price fluctuations, and taxation.

✓
Commodity Price Fluctuations: Prices for high-volume structural materials (such as TMT steel rebars and cement) are tied to daily wholesale market rates. Formal project quotations are valid for the specific timeframe stated on the estimate (typically 24 to 72 hours).
✓
GST Breakdown & Transparency: All product prices on product catalog pages and quotations clearly specify applicable GST rates (e.g., 18% or 28%) and freight charges before final checkout confirmation.
✓
Order Confirmation: A binding sales agreement comes into effect once full payment or approved credit terms are acknowledged and an official order confirmation is issued by Delivery At Site.
03

Direct Site Delivery & Unloading Terms

Logistical requirements to ensure safe, on-schedule transit to your project location.

3.1

Site Road Accessibility

The buyer must ensure that the designated delivery site has safe, motorable road access and municipal clearance for commercial transport vehicles (LCVs, 10-wheelers, or trailers).

3.2

Site Supervisor Coordination

An authorized site engineer or supervisor must be present at the site with a working contact number to receive the vehicle, verify delivery challans, and sign off.

3.3

Unloading Responsibilities

Unless crane/hydraulic offloading is explicitly contracted in your purchase order, standard wholesale deliveries are delivered to vehicle tailgate. Site labor for stacking remains buyer's responsibility.

3.4

Demurrage & Waiting Charges

To maintain logistics efficiency, vehicles delayed at site beyond standard unloading windows (2-3 hours) due to site inaccessibility may incur nominal standard detention charges.

04

Material Inspection, Acceptance & Transit Claims

Transparent process for verifying material counts and quality at time of delivery.

ⓘ

Mandatory Physical Verification Upon Arrival

The buyer's site team must inspect the delivered consignments before signing the official Delivery Challan (POD). Any transit damage, broken seals, packaging breach, or quantity mismatch must be noted on the physical challan and reported to our support desk within 24 to 48 hours along with clear photographic or video evidence.

05

Payment Terms & Commercial Credit

Standard financial procedures for smooth commercial order processing.

Direct Bank Transfer

Orders are dispatched upon confirmation of official NEFT / RTGS / IMPS wire transfers into our verified corporate bank account.

Digital Payment Gateways

Instant orders can be secured via authorized B2B payment gateways supporting corporate net-banking and verified business UPI.

Project Trade Credit

Formal credit terms (15/30 days) are available exclusively to verified ongoing institutional builders subject to credit evaluation and signed master agreements.

06

Cancellations, Returns & Restocking Terms

Policies governing order modifications for standard vs. customized materials.

6.1

Standard Stock Supplies

Unopened, standard catalog items in original manufacturer packaging (e.g., standard electrical boxes, plumbing fittings) may be returned within 7 days, subject to return freight and inspection.

6.2

Custom & Cut Materials

Custom-cut steel, pre-mixed paints/tinted coatings, factory-sized plywood sheets, or custom-imported architectural finishes cannot be cancelled once manufacturing or cutting commences.

07

Material Standards & Manufacturer Warranties

Quality guarantees, technical test certificates, and authentic brand warranties.

7.1

Manufacturer Warranty Pass-Through

Delivery At Site sources exclusively from certified primary manufacturers. All manufacturer guarantees (such as anti-termite plywood warranties or cable life cycles) pass directly to the client.

7.2

Test Certificates (MTC)

Mill Test Certificates (MTC) and factory laboratory quality reports for structural steel batches, cement lots, and copper purity are provided upon request with your dispatch dossier.

08

Grievance Redressal & Dispute Resolution

Direct communication channels for speedy resolution of commercial matters.

Commercial Grievance Officer

Delivery At Site

Commercial Building & Interior Material Procurement Desk

Support & Grievances: support@deliveryatsite.com
Desk Timings: Monday to Saturday (9:00 AM – 7:00 PM IST)
Jurisdiction: Subject to the exclusive jurisdiction of the competent courts in India.
Delivery At Site • Commercial Terms

Refund & Cancellation Policy

At Delivery At Site, we understand that commercial construction, architectural fit-outs, and MEP projects operate on tight schedules and dynamic site realities. This policy clearly outlines our cancellation procedures, return verification protocols, and commercial refund timelines with complete clarity and GST compliance.

Pre-Dispatch Cancellation

100% full refund on standard stocked materials cancelled prior to warehouse picking or vehicle loading at our distribution hub.

Transit Damage Protection

Any transit damages endorsed on the physical Delivery Challan upon arrival are replaced promptly or credited without hassle.

Official GST Credit Notes

All approved refunds and adjustments are issued with legal GST Credit Notes for seamless Input Tax Credit (ITC) reconciliation.

01

Order Cancellation Guidelines

Guidelines governing wholesale purchase orders before and after vehicle dispatch.

Before Dispatch • 100% Refund

You may cancel standard catalog materials without any cancellation fees before the transport vehicle is loaded and the e-Way bill is generated. A full 100% refund is initiated immediately.

After Dispatch • In-Transit Requests

If an order is cancelled while the transport truck is already in transit to your site, two-way freight charges and statutory handling fees will be deducted from the refundable amount.

Custom & Cut Materials • Non-Cancellable

Custom-cut electrical cables (e.g., custom metres of heavy armoured power cables), machine-tinted paints, and special non-stock order indent items cannot be cancelled once processed.

How to Request Cancellation

To request an order cancellation, call our B2B Support Desk or email orders@deliveryatsite.com with your Order ID, firm name, and dispatch status before vehicle departure.

02

On-Site Inspection & Acceptance Protocol

Mandatory commercial handover guidelines when unloading materials at your construction or fit-out site.

✓
Mandatory Verification Before Unloading: Your authorized site engineer, supervisor, or receiving foreman must physically inspect the truck condition, seal integrity, and outward packaging before signing the Delivery Challan (POD).
✓
Endorsement on Delivery Challan (POD): In the rare event of transit damage, torn packaging, or quantity discrepancies, the site supervisor must clearly note the exact damaged quantity on both copies of the physical Delivery Challan before the driver leaves.
✓
24-Hour Notice Window: Photographic evidence of damaged or defective items along with the endorsed Delivery Challan copy must be shared via WhatsApp support or email within 24 hours of arrival for instant claim processing.
✓
Resolution Options: For all verified transit damages, Delivery At Site offers you the choice of: (a) Free replacement dispatch on the next scheduled delivery truck, or (b) Immediate GST Credit Note adjustment against your account ledger.
03

Material Category Return Eligibility

Specific return conditions applicable across our 8 core B2B supply verticals.

Cement, Sand, Aggregates & AAC Blocks

Moisture-sensitive bagged commodities (UltraTech cement, Neru, M100 Sand) are non-returnable once safely unloaded at the site due to weather exposure risks. AAC Blocks breakage up to 3% is standard transit allowance in accordance with IS building trade norms.

Electrical Wires, Cables & Conduits

Standard uncut Polycab wire coils (90m, 180m, 300m) in intact factory packaging and undamaged holographic seals may be returned within 7 days. Cut-to-length armoured cables are strictly non-returnable.

False Ceiling Sheets & GI Profiles

Saint-Gobain Gypsum sheets and GI metal channels are eligible for claim only if transit edge-chipping, moisture-damage, or bend deformities are recorded at the time of truck arrival before stacking on site.

Hardware, Power Tools & Sanitaryware

Hettich drawer runners, Sensys hinges, Jaquar faucets, and Bosch power tools must be in original, uninstalled condition with complete manufacturer packaging, manuals, and accessories to be eligible for exchange.

04

Refund Methods & Commercial Timelines

Transparent return of funds via original commercial banking channels.

✓
B2B Bank Transfers (NEFT / RTGS / IMPS): Refunds for orders paid via direct bank transfer will be credited back exclusively to the registered business bank account of the ordering company within 3 to 5 commercial banking days.
✓
Corporate Credit & Trade Accounts: For contractors and builder firms operating on approved credit terms or trade credit ledgers, approved refunds are instantly credited to your commercial account balance for future procurement.
✓
Zero Processing Deductions: We charge zero administrative or processing fees on valid warranty claims, supplier out-of-stock cancellations, or verified transit damage refunds.
05

GST Credit Notes & ITC Compliance

Strict conformity with Indian Goods and Services Tax regulations.

Section 34 GST Credit Note

Every refund, price adjustment, or returned goods transaction is accompanied by a formal GST Credit Note referencing your original B2B Tax Invoice number, HSN codes, and taxable values.

GSTR-1 & GSTR-2B Auto-Reconciliation

Credit Notes are filed in our monthly GSTR-1 returns, ensuring your accounting department can effortlessly balance Input Tax Credit (ITC) without any discrepancies or tax audits.

06

Commercial Help & Dispute Desk

Dedicated B2B account managers ready to assist with returns, dispatches, and refund status.

Accounts & Refunds Desk

Email: billing@deliveryatsite.com

Response within 4 business hours

Site Dispatch & Transit Helpline

Phone: +91 98765 43210

Mon – Sat • 8:00 AM – 7:00 PM

Looking for Site Delivery Information?

Explore our complete transit timelines, site unloading guidelines, and vehicle specifications.

View Shipping Policy →
Delivery At Site • Project Logistics & Transport

Shipping & Delivery Policy

At Delivery At Site, our core business model is engineered around supplying wholesale building materials, interior finishes, and MEP hardware directly to active construction sites, commercial fit-outs, and builder projects. This policy explains our dispatch models, delivery timeframes, site access requirements, and unloading guidelines.

Direct-to-Site Dispatch

Direct transport from verified manufacturer plants and wholesale hubs directly to your project plot, cutting multi-handling damages.

Mandatory e-Way Bills

100% compliant commercial transit with valid GST e-Way bills and electronic delivery challans generated prior to vehicle movement.

Driver & Site Coordination

Real-time vehicle driver contact sharing and live WhatsApp coordination with your on-site supervisor for zero gate delays.

01

Fulfillment Model & Delivery Coverage

How materials move from manufacturing lines and central warehouses to your active construction site.

Just-in-Time (JIT) Dropship Logistics

To deliver certified, fresh-batch materials at wholesale prices without middleman markups, materials are dispatched directly from primary manufacturing facilities or authorized regional stock points to your site.

Geographical Delivery Coverage

We service active commercial, industrial, and residential construction sites across all major municipal corporations, urban development zones, and developing industrial corridors. Remote sites can be serviced via dedicated full truckloads (FTL).

02

Delivery Timelines & Dispatch Schedules

Estimated transit turnarounds categorized by material type and order volume.

✓
Standard Stock Materials (24 to 48 Hours): Standard Polycab house wires, conduits, Hettich channels, drywall screws, POP bags, and Birla White wall putty are typically dispatched within 24 hours of PO confirmation for next-day site delivery.
✓
Heavy Structural Materials • Cement & AAC Blocks (24 to 72 Hours): Full-truckload (FTL) orders of UltraTech cement (200+ bags), Siphorex AAC blocks, and sand are scheduled in coordination with site casting schedules to avoid on-site storage weathering.
✓
Specialized MEP, Cables & Architectural Indents (3 to 5 Business Days): Custom-drum heavy armoured power cables (3C/4C 16sqmm+), specialized Laticrete epoxy systems, and project-specific sanitaryware are dispatched directly from primary manufacturer depots.
✓
Emergency & Same-Day Dispatch: Subject to transport availability and local warehouse stock, priority dispatches can be arranged for ongoing site emergencies upon request to your account manager.
03

Project Site Access & Transport Fleet

Ensuring adequate access roads and adherence to municipal traffic guidelines for heavy commercial vehicles.

Transport Vehicle Categories

Depending on order weight and volume, dispatches are assigned to: (a) Small Commercial Vehicles (Tata Ace / Bolero Pickup • up to 1.5 MT), (b) Medium Commercial Vehicles (Tata 407 / Eicher • up to 4.5 MT), or (c) Heavy Commercial Trucks (10/12-Wheelers • up to 25 MT).

Municipal "No-Entry" Restrictions

Heavy commercial transport is subject to local municipal traffic restrictions (typically 8:00 AM – 12:00 PM and 5:00 PM – 9:00 PM). Dispatches for urban city zones are scheduled for non-restricted daytime or night windows accordingly.

Site Road Clearance & Turning Radius

The contractor/buyer is responsible for verifying that access roads to the site have adequate width, no overhead high-tension line obstructions below 14 feet, and sufficient turning radius for the dispatched vehicle size.

Inaccessible Sites & Re-routing

If a delivery vehicle cannot reach the exact plot due to narrow alleys, unpaved muddy roads, or gate closures, the driver will deliver to the nearest motorable access point as coordinated with your site supervisor.

04

Unloading Protocols & Free Detention Window

Standard commercial unloading responsibilities and detention charge parameters.

✓
Standard Delivery • Curbside Unloading: Our wholesale transport rates cover vehicular delivery to your site entrance (curbside/ground level). Unloading labour, site stacking, and vertical shifting (e.g., carrying cement bags or tiles to upper floors) are the responsibility of the project contractor unless pre-booked as an optional unloading service.
✓
Crane & Mechanical Unloading for Heavy Materials: Consignments of Siphorex AAC blocks (pallets) or heavy steel rebars require contractor-arranged mechanical hydra cranes or adequate site manual labour at the time of arrival to ensure fast unloading.
✓
Free Detention Time (2 Hours): Every transport vehicle includes 2 hours of complimentary unloading time upon arrival at your site gate.
✓
Demurrage / Detention Charges: If a vehicle is held beyond the 2-hour free window due to site unpreparedness, lack of labour, or gate lockouts, standard commercial detention charges (₹300 – ₹600 per additional hour depending on truck tonnage) will apply.
05

Proof of Delivery (POD) & Documentation

Commercial paperwork accompanying every consignment for tax and inventory verification.

Delivery Challan & Official Stamp

Every consignment arrives with two physical copies of the Delivery Challan specifying material SKUs, bundle counts, and weights. Your authorized receiving person must sign and stamp one copy for the driver to return as valid POD.

Digital Invoicing & WhatsApp POD

Simultaneously, the digital GST Tax Invoice and countersigned copy of the Delivery Challan are archived into your customer account portal and sent via WhatsApp to your procurement head.

06

Transport Support & Dispatch Helpline

Get in touch with our active fleet managers for truck tracking and gate coordination.

Central Dispatch Desk

Email: dispatch@deliveryatsite.com

e-Way bills • Fleet schedules • POD copies

Live Fleet Coordination Line

Phone: +91 98765 43210

Direct Driver & Gate Coordination

Need Information on Returns or Damaged Stock?

Review our formal guidelines on on-site inspection, return approvals, and GST credit notes.

View Refund Policy →